Finding a reliable PSU supplier is an important part of any electronic product development project. Once you’ve established a good working relationship and found a product that meets your specifications, there’s often little reason to look elsewhere.

But even the most dependable suppliers can experience disruptions. Component shortages, manufacturing delays or changes in product availability can leave engineering and purchasing teams searching for alternatives, sometimes with production deadlines fast approaching.

For manufacturers relying on a single source for critical components, the consequences can be costly. This is where dual sourcing, or having more than one qualified source of supply, can give your business greater flexibility when things don’t go to plan.

The Risks of Relying on a Single PSU Supplier

PSU availability can be affected by several factors, from shortages of electronic components and extended manufacturing lead times to shipping delays and product discontinuations. These issues are not always predictable, and businesses sourcing internationally may face further uncertainty around transport and delivery schedules.

The UK Government’s report on global supply chain risk and resilience highlights how dependence on critical suppliers, limited inventory and poor supply chain visibility can increase vulnerability to disruption.

For manufacturers of electronic equipment, the consequences can extend beyond a delayed delivery. If a specified PSU becomes unavailable, purchasing may need to investigate alternative sources, engineers may need to reassess technical requirements, and production schedules could need adjusting.

Without an approved alternative already in place, even a temporary supply issue can create additional work and put project deadlines at risk.

How One Missing PSU Can Affect an Entire Project

A bill of materials (BOM) can contain hundreds of components, yet a shortage of just one critical part can be enough to interrupt an otherwise well-planned production schedule.

Consider a manufacturer developing a new industrial control system. The engineering team has selected an AC/DC PSU that meets the required specifications, purchasing has agreed the supply arrangements, and production is scheduled to begin.

Everything is progressing as expected until the supplier advises that the agreed delivery date can no longer be met.

Without an approved alternative, the team now faces the challenge of finding a suitable replacement. Although other PSUs may offer similar voltage and wattage ratings, differences in mounting arrangements, connections, thermal performance or certification requirements could mean additional testing or changes to the existing design.

What started as a purchasing issue can quickly become an engineering problem, adding unexpected costs and putting project deadlines at risk.

This is where early component selection can make a difference. Identifying potential alternatives during the design stage gives engineers time to assess their suitability and purchasing teams more options if the original PSU becomes difficult to obtain.

The choice isn’t as simple as “open frame for compact equipment, enclosed for harsh environments”. Both formats are available across a wide range of power ratings and applications, so the decision depends on the product specification and the finished equipment.

Why Dual Sourcing and Multiple Suppliers Make Sense

Dual sourcing involves establishing two qualified sources for a component, giving manufacturers an alternative if their usual supplier cannot meet demand. Where more than two sources are involved, this is often described as multi-sourcing.

For electronic components, this might involve approving comparable products from different manufacturers or establishing relationships with additional distributors, rather than relying on a single source.

Beyond reducing the risk of supply disruption, having several suppliers gives purchasing teams more opportunities to compare lead times, pricing and service levels. It can make it easier to respond to changes in production demand or manage the discontinuation of existing components.

This approach extends beyond electronics manufacturing. Research from the Chartered Institute of Procurement & Supply (CIPS), produced with Deloitte, reported that 70% of private-sector respondents and 63% of public-sector respondents had increased their use of dual or multiple sourcing within strategic spending categories.

Of course, the value of having multiple suppliers depends on their ability to meet your requirements. An alternative source needs to offer more than product availability; it must support your technical specifications, production volumes and delivery schedules.

Engineers and Purchasing Teams Working Together

Although sourcing alternatives is often seen as a purchasing responsibility, engineers have an equally important role to play.

A purchasing team might identify another supplier offering a similar PSU at a competitive price, but that doesn’t necessarily mean the product will suit the existing design. Engineers need to assess its electrical and mechanical compatibility, along with the relevant safety standards, testing and certification requirements, before approving a replacement.

Purchasing teams, meanwhile, need to consider whether an alternative supplier can reliably support ongoing production. Competitive pricing is valuable, but inconsistent availability or unpredictable lead times could lead to additional costs and delays further down the line.

By working together early in the project, both teams can identify alternatives that meet the technical requirements and provide a dependable source of supply. This gives purchasing greater confidence in its available options without introducing unnecessary changes to the product design.

Multiple Suppliers Don’t Always Mean Independent Sources

Having several suppliers doesn’t necessarily mean you have independent sources of supply. For example, you might purchase the same PSU from different distributors, giving you more options for availability and delivery. But if they all rely on the same manufacturer, a production delay or component shortage could affect them all.

For critical components, it may be worth considering alternative PSUs from different manufacturers to reduce this dependency. Although this requires additional evaluation to confirm compatibility and compliance, it can provide greater flexibility over the longer term.

Of course, not every design can accommodate multiple PSU options, particularly where specialised specifications or mechanical requirements limit suitable alternatives. Identifying these restrictions early can help engineering and purchasing teams make more informed sourcing decisions.

Building Dual Sourcing Into Your BOM Planning

Rather than trying to qualify alternatives for every component, a more practical approach is to focus on those that would be difficult or costly to replace.

For PSUs, this could include units with specialised output configurations, unusual mechanical dimensions, demanding certification requirements or particularly long manufacturing lead times.

During the design stage, engineers can assess whether suitable alternatives exist and identify any changes that might be needed to accommodate them. Purchasing can then investigate potential suppliers, review lead times and consider their ability to support future production.

Once an alternative has been evaluated and approved, recording the relevant manufacturer, part number and any conditions for substitution can make future purchasing decisions easier. Maintaining this information within an approved manufacturer list or vendor list gives both teams a clear reference when reviewing orders.

It’s equally important to keep these records up to date. Products can be discontinued, specifications may change, and suppliers that were previously able to meet demand might face different availability constraints.

Reviewing approved alternatives periodically helps ensure they remain practical options throughout the product lifecycle.

Why Stock Planning Still Matters

Even with several approved suppliers, there’s no guarantee that an alternative PSU will be immediately available. Industry-wide component shortages, increased demand or manufacturing delays can affect multiple sources at the same time, leaving businesses facing similar lead times regardless of where they purchase their components.

This is why dual sourcing works best alongside realistic forecasting and forward stock planning. For manufacturers with ongoing production requirements, agreeing stock arrangements in advance can help reduce uncertainty and keep deliveries aligned with manufacturing schedules.

One approach is to use call-off ordering arrangements, where customers commit to agreed quantities over a set period and receive stock in scheduled deliveries. For example, Ideal Power’s 12-month call-off service allows customers to commit to their forecast annual requirements, with the agreed stock held at our UK warehouse until needed.

This can help businesses manage their storage space and reduce the risk of short-term availability issues affecting production.

Combining approved alternative sources with planned purchasing gives manufacturers more flexibility when responding to changing supply conditions.

Finding the Right PSU Supplier for Your Project

Choosing an additional PSU supplier involves more than checking product availability. Technical knowledge, manufacturing relationships and long-term supply reliability are all worth considering, particularly when sourcing critical components for your designs.

At Ideal Power, we work with engineers and purchasing teams to identify suitable AC/DC and DC/DC PSU solutions, including modified or custom-made options where standard products don’t meet the required specifications.

Our dedicated account management and planned call-off arrangements can support ongoing production, helping customers coordinate their stock and delivery requirements.

Don’t Let One Supplier Determine Your Production Schedule

An established supplier relationship is valuable, but relying entirely on one source for critical components can create unnecessary risks.

By identifying suitable alternatives early and keeping sourcing options under review, engineering and purchasing teams can reduce the pressure of finding replacements at short notice and make more informed decisions when availability changes.

The goal isn’t to replace a trusted supplier. It’s to make sure your project doesn’t depend entirely on one.

If you’re reviewing your BOM or considering additional sourcing options, get in touch with our sales and technical team to discuss your requirements.

CONTACT US

Frequently Asked Questions:

🔽 What is dual sourcing in electronics manufacturing?
Dual sourcing, also known as second sourcing, involves qualifying two suppliers or sources for a component used in an electronic product. It helps manufacturers reduce dependence on a single source and provides an alternative if their primary supplier experiences shortages, extended lead times or product discontinuation.
🔽 Why is dual sourcing important for PSU procurement?
Dual sourcing helps manufacturers reduce supply chain risks, manage changing lead times and protect production schedules. Having an approved alternative PSU supplier gives purchasing teams greater flexibility when sourcing critical components and reduces the need for last-minute procurement decisions.
🔽 How can engineers identify an alternative PSU for an existing design?
Engineers should compare the electrical specifications, mechanical dimensions, thermal performance and relevant safety approvals of potential replacements. Any alternative PSU must meet the application's requirements and may need additional testing before it can be approved for use.
🔽 What is the difference between dual sourcing and multi-sourcing?
Dual sourcing involves using or qualifying two suppliers or sources for a component, whereas multi-sourcing involves three or more. Both approaches help reduce supplier dependency and improve purchasing flexibility. Manufacturers should also consider whether their suppliers rely on the same production facilities or manufacturing sources.
🔽 How can manufacturers reduce the risk of PSU supply shortages?
Manufacturers can reduce PSU supply risks by qualifying alternative suppliers, maintaining an up-to-date approved manufacturer list (AML) and reviewing component availability regularly. Accurate demand forecasting, forward stock planning and scheduled call-off orders can help maintain production continuity.